{"id":21379,"date":"2015-07-21T08:24:28","date_gmt":"2015-07-21T13:24:28","guid":{"rendered":"http:\/\/www.bemidjistate.edu\/news\/?p=21379"},"modified":"2015-07-21T08:24:28","modified_gmt":"2015-07-21T13:24:28","slug":"bemidji-pioneer-groundbreaking-scheduled-for-university-heights","status":"publish","type":"post","link":"https:\/\/www.bemidjistate.edu\/news\/2015\/07\/21\/bemidji-pioneer-groundbreaking-scheduled-for-university-heights\/","title":{"rendered":"Bemidji Pioneer: Groundbreaking scheduled for University Heights"},"content":{"rendered":"<p class=\"p1\"><span class=\"s1\">BEMIDJI&mdash;A formal groundbreaking ceremony will be held July 28 for a construction project already underway along Bemidji Avenue.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">The development, which will stretch between 15th Street and 18th Street NW, is University Heights, a $3.7 million student housing venture adjacent to the BSU campus. The project&rsquo;s work is being handled by Kraus-Anderson Construction Co. and the area is being developed by Peterson Developers.<\/span><\/p>\n<p class=\"p2\"><span class=\"s1\">Originally home to Bemidji High School, the most recent owner of the land was the Bemidji State University Foundation, who finalized the sale to Peterson Developers earlier this year.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">University Heights is a multi-phase project that will begin with a 26,444-square-foot apartment building near 18th Street NW. Completion is expected in May and will be open to tenants in August 2016, a release said. The structure, designed by MJ Architectural, will have four stories with 16 apartment units with individual rooms for a total of 56 students.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">The next phases for University Heights will include five additional apartment complexes and 12 townhomes; the second building is expected to be completed by August 2019. Four of the apartment complexes in the development will include first-level retail businesses, the release said.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">The groundbreaking ceremony will start at 11 a.m. July 28 at 1725 Bemidji Ave. N.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>BEMIDJI&mdash;A formal groundbreaking ceremony will be held July 28 for a construction project already underway along Bemidji Avenue. The development, which will stretch between 15th Street and 18th Street NW, is University Heights, a $3.7 million student housing venture adjacent to the BSU campus. The project&rsquo;s work is being handled by Kraus-Anderson Construction Co. and [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"link","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[1],"tags":[],"class_list":["post-21379","post","type-post","status-publish","format-link","hentry","category-uncategorized","post_format-post-format-link"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.bemidjistate.edu\/news\/wp-json\/wp\/v2\/posts\/21379","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bemidjistate.edu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bemidjistate.edu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bemidjistate.edu\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bemidjistate.edu\/news\/wp-json\/wp\/v2\/comments?post=21379"}],"version-history":[{"count":1,"href":"https:\/\/www.bemidjistate.edu\/news\/wp-json\/wp\/v2\/posts\/21379\/revisions"}],"predecessor-version":[{"id":21380,"href":"https:\/\/www.bemidjistate.edu\/news\/wp-json\/wp\/v2\/posts\/21379\/revisions\/21380"}],"wp:attachment":[{"href":"https:\/\/www.bemidjistate.edu\/news\/wp-json\/wp\/v2\/media?parent=21379"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bemidjistate.edu\/news\/wp-json\/wp\/v2\/categories?post=21379"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bemidjistate.edu\/news\/wp-json\/wp\/v2\/tags?post=21379"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}