{"id":30600,"date":"2018-01-02T08:46:59","date_gmt":"2018-01-02T14:46:59","guid":{"rendered":"http:\/\/www.bemidjistate.edu\/news\/?p=30600"},"modified":"2018-01-02T08:46:59","modified_gmt":"2018-01-02T14:46:59","slug":"bemidji-pioneer-high-profile-solar-power-project-planned-at-bsu","status":"publish","type":"post","link":"https:\/\/www.bemidjistate.edu\/news\/2018\/01\/02\/bemidji-pioneer-high-profile-solar-power-project-planned-at-bsu\/","title":{"rendered":"Bemidji Pioneer: High-profile solar power project planned at BSU"},"content":{"rendered":"<p><figure id=\"attachment_30601\" aria-describedby=\"caption-attachment-30601\" style=\"width: 640px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-30601 size-large img-fluid\" src=\"http:\/\/www.bemidjistate.edu\/news\/wp-content\/uploads\/sites\/3\/2018\/01\/airc3-1024x536.png\" alt=\"\" width=\"640\" height=\"335\" data-bp=\"https:\/\/www.bemidjistate.edu\/news\/wp-content\/uploads\/sites\/3\/2018\/01\/airc3.png\" srcset=\"https:\/\/www.bemidjistate.edu\/news\/wp-content\/uploads\/sites\/3\/2018\/01\/airc3-1024x536.png 1024w, https:\/\/www.bemidjistate.edu\/news\/wp-content\/uploads\/sites\/3\/2018\/01\/airc3-300x157.png 300w, https:\/\/www.bemidjistate.edu\/news\/wp-content\/uploads\/sites\/3\/2018\/01\/airc3-768x402.png 768w, https:\/\/www.bemidjistate.edu\/news\/wp-content\/uploads\/sites\/3\/2018\/01\/airc3-226x118.png 226w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><figcaption id=\"caption-attachment-30601\" class=\"wp-caption-text\">Plans for a photovoltaic solar installation in the parking lot of BSU&rsquo;s American Indian Resource Center &ndash; a first for Bemidji State &ndash; are moving ahead. Here&rsquo;s an artist&rsquo;s rendering of the 36.3-kilowatt project, which is envisioned as an overhead, carport-style structure that would meet 20 to 30 percent of the AIRC&rsquo;s electricity needs and reduce yearly utility bills by an estimated $112,000. (Submitted photo)<\/figcaption><\/figure>\n<\/p><p>BEMIDJI &mdash; Bemidji State University leaders plan to raise hundreds of thousands of dollars to install solar panels at the school&rsquo;s American Indian Resource Center.<\/p>\n<p>Staff want to install the $230,000 photovoltaic panels at the resource center&rsquo;s parking lot &mdash; strategically visible from the nearby football stadium and Birchmont Drive &mdash; by spring 2019.<\/p>\n<p>&ldquo;To have it in a place that is so visible, I think it will have significant exposure, to show what we are doing to help reduce our carbon footprint,&rdquo; Faith Hensrud, BSU&rsquo;s president, said in a statement to the Pioneer. &ldquo;We can show the community, we can show our students what it is that we are doing to make a difference.&rdquo;<\/p>\n<p>BSU administrators estimate the 36-kilowatt panels would supply about a quarter of the resource center&rsquo;s electricity and shave $112,000 off the university&rsquo;s utility bills over 30 years. (The school spends about $675,000 per year on electricity.)<\/p>\n<p>University staff plan to ask prospective donors to fund the project as part of their broader annual push for donations. Donors gave the university $2.3 million last fiscal year, most of which went to student scholarships. University spokesperson Scott Faust said he wasn&rsquo;t sure if the school had applied for any grants for the solar project yet &mdash; but the school could apply for a &ldquo;leverage equipment&rdquo; grant that would put some state money towards the project. The project could also get about $45,000 in rebates from Otter Tail Power, he added.<\/p>\n<p>Students at the university approved a solar energy referendum last spring, and staff expect them to help design and decorate the concrete columns on which the panels would be built.<\/p>\n<p>To learn more about the planned solar project, contact Jana Wolff at the BSU Alumni and Foundation at (218) 755-2872. The foundation hopes to raise $2.7 million for the university this year.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>BEMIDJI &mdash; Bemidji State University leaders plan to raise hundreds of thousands of dollars to install solar panels at the school&rsquo;s American Indian Resource Center. Staff want to install the $230,000 photovoltaic panels at the resource center&rsquo;s parking lot &mdash; strategically visible from the nearby football stadium and Birchmont Drive &mdash; by spring 2019. &ldquo;To [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"link","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[1],"tags":[],"class_list":["post-30600","post","type-post","status-publish","format-link","hentry","category-uncategorized","post_format-post-format-link"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.bemidjistate.edu\/news\/wp-json\/wp\/v2\/posts\/30600","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bemidjistate.edu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bemidjistate.edu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bemidjistate.edu\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bemidjistate.edu\/news\/wp-json\/wp\/v2\/comments?post=30600"}],"version-history":[{"count":1,"href":"https:\/\/www.bemidjistate.edu\/news\/wp-json\/wp\/v2\/posts\/30600\/revisions"}],"predecessor-version":[{"id":30602,"href":"https:\/\/www.bemidjistate.edu\/news\/wp-json\/wp\/v2\/posts\/30600\/revisions\/30602"}],"wp:attachment":[{"href":"https:\/\/www.bemidjistate.edu\/news\/wp-json\/wp\/v2\/media?parent=30600"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bemidjistate.edu\/news\/wp-json\/wp\/v2\/categories?post=30600"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bemidjistate.edu\/news\/wp-json\/wp\/v2\/tags?post=30600"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}